Monday 11 July 2016

Report of Mission of TeamAIAPC at the Directorate on 08-07-2016


In a planned mission to the Directorate on 08-07-2016, TeamAIAPC has tried to explore the current facts regarding Postmaster Cadre. AIAPC has successfully completed the mission and do hereby publish the report of the mission hereunder for the information of members.  

TeamAIAPC
DOP
Points and Reply
Sri Balveer Singh (GS)
Sri Narinder Pal
Sri Ashok Kumar with whole hearted active support from AIAPC Delhi Circle
ADG (SPN)
Point raised:
Eligibility for crucial date of one time relaxation should either be date of declaration of result of LDCE for PM Gr-I (1st Batch) i.e. on 30/06/2011 or date of joining as PM Gr-I  of same batch lastly on 31/01/2012.
Reply given:
Agreed and suggested to send revised representation which will be settled after Cadre Restructuring of Postmaster Cadre. Revised representation is under process and will be submitted soon.
Do
ADG (DE)
Point raised:
Why is the Directorate not conducting LDCE for PM Gr-I/ Sr. PM?
Reply given:
Tender with CMC has been cancelled. Tender for conducting examination are being floated. Further this is also proposal in pipeline to decentralize these exams.
Do
PCC
Point raised:
What for PM Cadre in 7th CPC?
Reply given:

Reply has already been sent on 04-07-2016. The DOP pleased to recommend up-gradation of Grade Pay of PM Gr-I, PM Gr-II, PM Gr-III and Sr. PM as 4200, 4600, 4800 and 5400 respectively to the MOF (PCIC) as already published in our website on 3rd April 2016 as Postmaster Cadre pays gratitude to the 7 CPC and the DOPwhich are now confirmed on paper.

Do
ADG (SPG)
Point raised:
100% posts of PM Cadre in Sr. PM Recruitment Rules.
Reply given:
The Posts of Sr PM as per existing RR is yet to be curved out. We have to continue a long battle towards achieving this goal.
Do
ADG (Estt-I/ PE-I)
Point raised:
Progress of Cadre Restructuring of PM Cadre.
Reply given:
As per AIAPC’s proposal vide letter No. AIAPC-31/Corr/2016-17 dated 15-06-2016 the matter is being considered towards fulfillment of our expectation. Memo will be issued within a month or two.


                          !!   AIAPC ZINDABAD !! 

                             TeamAIAPC







10 comments:

  1. Congratulation to aiapc for great achievement.

    ReplyDelete
  2. Congratulation to aiapc for great achievement.

    ReplyDelete
  3. Thanks for Communicating Me. The credit really goes to you and your Team. ... I am and on behalf of Odisha Circle heartily Congratulate to you and be with you always. ....

    ReplyDelete
  4. congratulations to aiapc for clarifying core doubts of the post master cadre. thanks for your sincere efforts. please also take up the issue of filling up of 25% Sr.PM posts with available PM Gr.III officials.

    ReplyDelete
  5. kindly clarify whether the proposal for upgradation of GP of Post master cadre is sent to Fin Min or not? If so, copy of a report may please be obtained from concerned division of postal directorate. Any time frame is there for accepting our DoP proposal???

    ReplyDelete
  6. Well done team AIAPC. Congratulations.......

    ReplyDelete
  7. Sabbash AIAPC. DOING WELL KEEP IT UP. BADAIYEE HO.

    ReplyDelete
  8. Sabbash AIAPC. DOING WELL KEEP IT UP. BADAIYEE HO.

    ReplyDelete
  9. What about higher financial powers and administrative powers,as we have been devoid of appearing pss group B exams and Ipo exams.

    ReplyDelete
  10. Good move, the present aspirations of PM Cadre are 1. Getting 4200 Grade Pay to Grade I and so on.
    2. Cadre Restructuring in PM Cadre on par with increase in LSG/HSGII/HSG I Posts
    3. Eligibility to appear for IPO and PSS Group B Examination.

    ReplyDelete